Shaft seal WBS

Shaft seal with metallic casing and dust lip (formerly DIN 3760 Form BS).

Application Range
Pressure: ≤ 0,5 bar
Temperature: -35 °C / +100 °C
Standard Material: NBR

Other materials are available for very high or very low operating temperatures. For detailled information, please look at the specific PDF catalogue or contact our application engineers.

Load product catalog

Are you missing materials or dimensions?

Feel free to contact us!

Our sealing experts will be happy to advise you!

+49(201)86606-0 or vk@techno-parts.de

Filter

Di [mm] Da [mm] b [mm]
Min:
Max:
Material selection
Material:
Availablility
Material No.
Loading data …
Profile Di [mm] Da [mm] b [mm] Material Mat. No. V Quantity
WBS 30.00 47.00 7.00 FKM 0002K 2
WBS 180.00 200.00 15.00 NBR 0000K 2
WBS 370.00 410.00 15.00 NBR 0000K 2
WBS 65.00 85.00 10.00 NBR 0000K 2
WBS 25.00 35.00 7.00 NBR 0000K 2
WBS 40.00 54.00 7.00 NBR 0000K 2
WBS 40.00 55.00 9.00 NBR 0000K 2
WBS 30.00 42.00 7.00 NBR 0000K 2
WBS 50.00 65.00 8.00 NBR 0000K 2
WBS 220.00 250.00 15.00 NBR 0070N 2
WBS 35.00 45.00 7.00 NBR 0000K 2
WBS 16.00 30.00 7.00 FKM 0002K 2
WBS 150.00 170.00 15.00 NBR 0000K 2
WBS 54.00 69.00 12.00 NBR 0000K 2
WBS 75.00 100.00 13.00 NBR 0000K 1
WBS 50.00 62.00 6.00 FKM 0002K 2
WBS 42.00 62.00 7.00 NBR 0000K 2
WBS 125.00 150.00 13.00 NBR 0000K 2
WBS 60.00 75.00 8.00 FKM 0070V 2
WBS 540.00 600.00 25.00 NBR 0000K 2
WBS 75.00 100.00 13.00 NBR 0070N 2
WBS 105.00 120.00 8.00 FKM 0002K 2
WBS 40.00 52.00 7.00 NBR 0000K 2
WBS 25.00 40.00 7.00 FKM 0002K 2
WBS 125.00 160.00 16.00 FKM 0002K 1
WBS 32.00 52.00 12.00 NBR 0000K 2
WBS 60.00 75.00 8.00 NBR 0000K 2
WBS 20.00 35.00 7.00 NBR 0070N 1
WBS 155.00 190.00 15.00 NBR 0000K 2
WBS 90.00 110.00 13.00 NBR 0000K 1
WBS 65.00 90.00 13.00 NBR 0070N 1
WBS 30.00 40.00 7.00 FKM 0002K 2
WBS 41.00 53.00 7.00 NBR 0000K 2
WBS 32.00 42.00 7.00 NBR 0000K 2
WBS 30.00 47.00 7.00 NBR 0000K 1
WBS 30.00 52.00 10.00 NBR 0000K 2
WBS 15.00 30.00 7.00 FKM 0002K 2
WBS 120.00 140.00 13.00 NBR 0000K 2
WBS 40.00 62.00 7.00 FKM 0002K 2
WBS 38.00 52.00 7.00 NBR 0000K 2
WBS 80.00 100.00 13.00 NBR 0000K 2
WBS 55.00 72.00 10.00 NBR 0000K 2
WBS 15.00 30.00 7.00 FKM 0163V 1
WBS 17.00 30.00 8.00 NBR 0000K 2
WBS 20.00 35.00 7.00 FKM 0002K 2